no image

The permission number 100181948, was assigned to the building construction with the subsequent map coordinates: latitude 41 912901908 and longitude -87 635904464. The Permit - Easy Permit Process is the type of the the aforestated permission. 06/04/2007 is the day when this document was prepared. The final cost is not yet established. However, the predicted cost is that: $2000 00. The first constructor, on the payroll for this building, is the well-known Mathew Ziol, who is listed as: Owner As General Contractor.

The construction with the coordinates: (41 9911817534467, -87 6601550832236) screen

The construction with the coordinates: (41 9911817534467, -87 6601550832236)

The approval nr 100572194, was assigned to the building construction with the subsequent map coordinates: latitude 41...