The building construction with the coordinates: (41 99488451184781, -87 82171814472629)

no image

The consent nr 100509925, was assigned to the construction with the subsequent map coordinates: latitude 41 994884512 and longitude -87 821718145. The Permit - Easy Permit Process is the type of the the aforestated authorisation. 09/23/2013 is the date when this certificate was issued. The final cost is not yet established. However, the predicted cost is that: $17400 00. The first constructor, who was hired to work on this building, is the well-known Adela Rus, who is listed as: Owner As General Contractor.

The building construction with the coordinates: (41 787071678456236, -87 6205019154781) screen

The building construction with the coordinates: (41 787071678456236, -87 6205019154781)

The approval number 100194677, was assigned to the building construction with the following map coordinates: latitude 41...