The building with the coordinates: (41 98113454543051, -87 84163842292439)

no image

The consent number 100449305, was assigned to the building construction with the subsequent map coordinates: latitude 41 981134545 and longitude -87 841638423. The Permit - Electric Wiring is the type of the the aforestated approval. The total cost is not yet known. Nonetheless, the estimated cost is that: $6864 00. The first constructor, who was hired to work on this building, is the respected A d t Inc , who is listed as: Contractor-Electrical.

The building with the coordinates: (41 89792529701786, -87 75552643326202) screen

The building with the coordinates: (41 89792529701786, -87 75552643326202)

The consent nr 100420040, was assigned to the building construction with the following map coordinates: latitude 41...