The construction with the coordinates: (41 74732805461216, -87 6838545104874)

no image

The approval nr 100248555, was assigned to the construction with the following map coordinates: latitude 41 747328055 and longitude -87 68385451. The Permit - Electric Wiring is the type of the the aforestated approval. 07/22/2008 is the date when this certificate was signed. It is not known how big the total cost will be. Nonetheless, the predicted cost is this: $1 00. The first constructor, on the payroll for this building, is the famous Scardino Electric, Inc , who is listed as: Contractor-Electrical.

The building with the coordinates: (41 89792529701786, -87 75552643326202) screen

The building with the coordinates: (41 89792529701786, -87 75552643326202)

The consent nr 100420040, was assigned to the building construction with the following map coordinates: latitude 41...