The construction with the coordinates: (41 74878258111734, -87 65262873614178)

no image

The approval nr 100151256, was assigned to the construction with the subsequent map coordinates: latitude 41 748782581 and longitude -87 652628736. The Permit - New Construction is the type of the the aforementioned consent. 12/29/2006 is the day when this certificate was signed. The final cost is not yet established. However, the predicted cost is this: $212800 00. The first contractor, on the payroll for this building, is the respected Simovic Laszlo, who is listed as: Architect.

The building construction with the coordinates: (41 881722456809335, -87 63716361820067) screen

The building construction with the coordinates: (41 881722456809335, -87 63716361820067)

The approval number 100476053, was assigned to the construction with the following map coordinates: latitude 41...