The construction with the coordinates: (41 87429616149979, -87 66761281051762)

no image

The consent nr 100262659, was assigned to the construction with the subsequent map coordinates: latitude 41 874296161 and longitude -87 667612811. The Permit - New Construction is the type of the the aforestated approval. 11/17/2008 is the date when this certificate was signed. The total cost is not yet known. However, the estimated cost is that: $54000 00. The first constructor, on the payroll for this construction, is the well-known Rush University Medical Center, who is listed as: Owner.

The building construction with the coordinates: (41 787071678456236, -87 6205019154781) screen

The building construction with the coordinates: (41 787071678456236, -87 6205019154781)

The approval number 100194677, was assigned to the building construction with the following map coordinates: latitude 41...