The construction with the coordinates: (41 93093575622094, -87 68579201111525)

no image

The permission number 100232743, was assigned to the building construction with the subsequent map coordinates: latitude 41 930935756 and longitude -87 685792011. The Permit - Renovation/alteration is the type of the the aforestated authorisation. 07/29/2008 is the date when this document was prepared. The final cost is not yet established. Nonetheless, the approximate cost is that: $250000 00. The first constructor, who was hired to work on this building, is the honored Uliasz Peter, who is listed as: Self Cert Architect.

The building construction with the coordinates: (41 787071678456236, -87 6205019154781) screen

The building construction with the coordinates: (41 787071678456236, -87 6205019154781)

The approval number 100194677, was assigned to the building construction with the following map coordinates: latitude 41...