The construction with the coordinates: (41 93296594290654, -87 64207954883415)

no image

The permission number 100349785, was assigned to the construction with the subsequent map coordinates: latitude 41 932965943 and longitude -87 642079549. The Permit - Renovation/alteration is the type of the the previously mentioned permission. 07/28/2010 is the date when this document was registered. It is not known how big the total cost will be. Nonetheless, the estimated cost is that: $20000 00. The first constructor, on the payroll for this construction, is the respected Calamaro Moshe, who is listed as: Structural Engineer.

The building construction with the coordinates: (41 881722456809335, -87 63716361820067) screen

The building construction with the coordinates: (41 881722456809335, -87 63716361820067)

The approval number 100476053, was assigned to the construction with the following map coordinates: latitude 41...