The construction with the coordinates: (41 9519203090338, -87 68583014815684)

no image

The approval number 100507583, was assigned to the construction with the following map coordinates: latitude 41 951920309 and longitude -87 685830148. The Permit - New Construction is the type of the the aforestated authorisation. 11/01/2013 is the day when this document was issued. The final cost is not yet established. Nonetheless, the predicted cost is this: $220000 00. The first contractor, on the payroll for this construction, is the honored Simovic Laszlo, who is listed as: Self Cert Architect.

The construction with the coordinates: (41 92591768519267, -87 66591213013861) screen

The construction with the coordinates: (41 92591768519267, -87 66591213013861)

The approval nr 100581059, was assigned to the construction with the following map coordinates: latitude 41 925917685...